Manarah Tower
Special manually rotating basket traversing on monorail. In this project, the monorail was not supplied or installed by Orientals, but we had to recheck it all and replace some bolts. then we have installed a new rotating cradle that is needed to reach certain parts of the building that are recessed in the facade.
The OSLER cradle installed had to be designed carefully so as to maintain low dead load force on the monorail.
Quick facts
- Client Name:
- Project Location:
- Installation Date:
- Completion Date:
- Saudi Bin Laden Group
- Riyadh, KSA
- October 2014
- May 2015
OSLER products used in this project
- Fall Arrest Line System
- Single Jib Roof Car Machine
- Internal Monorail System
Related Projects
Or Continue Browsing Projects