W Hotel Amman
Special Suspension System
OSLER’s scope was to design, manufacture, supply, and install the BMU system at the W-Hotel project in Amman. After many studies made with the main contractor and the consultant, the monorail option was selected.
On the podium buildings, a horizontal monorail system was installed with OSLER BMU basket. There are 4 separate rails on the building.
In the tower, a climbing rail was installed to follow the shape of the parapet. There are 4 separate rails as well.
Quick facts
- Client Name:
- Consultant:
- Dubai Construction Company (DCC)
- ERGA Progress Engineering Consultants & Sobeh Consulting Engineers
- Project Location:
- Installation Date:
- Completion Date:
- Amman, Jordan
- March 2016
- June 2016
OSLER products used in this project
- Aluminum Monorail Systems
- Climbing Monorail Systems
- Scissor Dock Lift
- Roller Shutter Doors
- Helipad Structure Steel Work